Utility & Pavement Design

About

Miller & Associates provides engineering design services for utility and pavement systems that support residential, commercial, and industrial site development. Our team plans and coordinates critical infrastructure, including water distribution, sanitary sewer, stormwater management, and other utility systems, while evaluating existing infrastructure capacity, site constraints, and future development demands.

We also design pavement systems for streets, parking lots, loading areas, and access drives, considering traffic volumes, structural requirements, site circulation, and long-term maintenance performance. By integrating utility and pavement engineering early in the development process, we help create sites that are functional, durable, and prepared to support long-term growth and operational needs.

Features

  • Water, Wastewater, & Stormwater Utility Design
  • Existing Infrastructure Coordination
  • Street, Parking, & Access Drive Pavement Design
  • Traffic Pattern Analysis
  • Integrated Utility & Site Design

Part 5 Improvements – Talmadge Street & Yanney Avenue

Kearney, NE
Utility & Pavement Design, Streets, Planning, Engineering, Surveying, Construction
Part 5 Improvements – Talmadge Street & Yanney Avenue completed project
birds eye view of roundabout
birds eye view of roundabout & surrounding roads
roundabout under construction

Project Features

  • Two Modern Roundabouts
  • Storm Sewer Improvements
  • Underground Utility Improvements
  • Sidewalk & Pedestrian Enhancements
  • Street Lighting & Streetscape Improvements

Services We Provided

  • Transportation Planning
  • Roadway & Roundabout Design
  • Traffic Operations Analysis
  • Storm Drainage Design
  • Utility Coordination
  • Grading & Pavement Design
  • Sidewalk & ADA Accessibility Design
  • Preparation of Construction Plans & Specifications
  • Preparation of Bidding Documents
  • Construction Administration & Observation

As development continued along Kearney's southern growth corridor, the City partnered with Miller & Associates to design and construct the 2021 Part 5 Improvements along Talmadge Street and Yanney Avenue. The project was developed to improve traffic operations, support future commercial development, and provide safe, efficient access to major destinations, including the Younes Campus and Kearney SportsPlex.

Miller & Associates provided engineering services from preliminary design through construction. Improvements included new Portland cement concrete roadways, underground utilities, storm sewer infrastructure, curb and gutter, sidewalks, street lighting, and streetscape enhancements. A defining feature of the project was the design and construction of two modern four-legged roundabouts that improve traffic flow, reduce conflict points, and enhance intersection safety.

Throughout construction, Miller & Associates coordinated closely with the City, utility providers, contractors, and project stakeholders to successfully navigate construction sequencing and an unexpected contractor transition while maintaining project progress. Advanced Civil 3D corridor modeling, roundabout design tools, and turning movement analyses were used throughout design to ensure the corridor accommodated projected traffic volumes and a wide range of vehicle types.

Completed in 2023, the approximately $4.8 million project included more than 21,600 square yards (S.Y.) of concrete pavement and received the Nebraska Concrete Paving Association Excellence in Local Projects of Less than 30,000 S.Y. The completed corridor provides a durable, high-capacity transportation network that supports continued economic development while improving mobility and safety for residents and visitors.